Clinic building in Harare, Zimbabwe. Context photography; not a verified NPE team, facility or project.
Healthcare & Pharma
Hospitals, clinics, laboratories and pharmaceutical facilities need distribution that respects clinical continuity and controlled environments.
We design around essential supplies, tested transfer sequences, UPS-backed loads and cold-chain risk.
Healthcare & Pharma Priorities
Essential and non-essential load segregation
ATS and UPS transfer confidence with witnessed testing
Clinical maintenance coordination
Clean-room and laboratory distribution planning
Typical Applications
Hospital essential services reviewLaboratory panel board upgradeClinic ATS replacementCold-chain and pharmacy store distribution
Distinguish essential services from general building loads early.
Information to send
Designer-defined clinical or process load categories
Required transfer times and equipment constraints
Ventilation, cold chain and maintenance access
Scope to agree
Project-specific continuity strategy
Protection and transfer interfaces
Monitoring and verification requirements
What changes the selection?
Equipment duty, installation conditions, available fault current, control interfaces and expansion plans all affect the specification. Agree the required drawings, tests and handover records before placing an order.
Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.
Conceptual automatic transfer switch controllers scene; exact specifications vary.