Generator changeover sequence guide

Agree source conditions, timing and interlocks before choosing a transfer controller.

Prepare your enquiryRead the selection guide

Generator changeover sequence guide — engineering concept

Decisions before procurement

Generator changeover sequence guide — application checks
DecisionWhat to establishEvidence to bring
Recognise and startDefine failure thresholds, recognition delay, generator start and failed-start alarm.Voltage/frequency limits and generator interface
TransferCheck stabilisation and mechanically/electrically interlocked open transfer. Closed transition needs a separate engineered scheme.Switching assembly, neutral arrangement and interruption allowance
Return and cool downAgree return delay, retransfer, unloaded cooling and manual operation. The controller is not the complete switching assembly.Cause-and-effect and witnessed acceptance tests

Your project brief

  • Single-line diagram and current/fault duty
  • Source ratings and generator interfaces
  • Neutral/earthing arrangement and interlocks
  • Delays, alarms, interruption and test scope

Confirm the actual supply and control voltage. Kenyan projects commonly specify 230/240 V single-phase or 400/415 V three-phase; the selected equipment must match the measured supply and manufacturer rating.

Engineering methods

Related guides

Choose a reference or send your BOQ

Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.

Send a BOQ for quotationDiscuss the application

Technical references

These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.