UPS battery sizing

Estimate nominal battery energy and amp-hours from load, runtime, inverter efficiency and usable capacity.

Enable JavaScript for live calculations. Read the method and default example below.

Method and assumptions

  • DC energy = AC load × runtime / inverter efficiency. Nominal energy includes the entered reserve and usable fraction.
  • Ah = nominal energy × 1000 / nominal DC voltage.

Before using the result

  • Energy budget only, not an IEEE 485 battery selection. Verify discharge-rate curves, minimum DC voltage, aging, temperature, BMS limits, fault protection and actual UPS compatibility. No battery life or breaker rating is predicted.

Worked example

Illustrative default inputs. Enter your project values above.

AC load
5 kW
Backup time
30 min
Nominal DC bus voltage
48 V DC
Battery chemistry
VRLA
Inverter efficiency
92 %
Usable nominal capacity
50 %
Energy reserve
20 %

Default results

Nominal energy budget
6.52 kWh
Nominal amp-hour budget
135.9 Ah
Continuous DC current estimate
113.2 A

Choose a reference or send your BOQ

Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.

Send a BOQ for quotationDiscuss the application

Technical references

These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.