+254 0737-944-014 WhatsApp sales@nairobipower.co.ke
Nairobi Power Engineers Ltd (NPE) logo Nairobi Power Engineers

Single-Phase Meter Boards

Metering for homes, shops and small offices

Single-phase meter boards provide the metering compartment, main switch and final distribution for domestic dwellings and small commercial supplies. NPE builds them ready for a direct 240 V connection with sealed tails.

A typical board carries the meter position, a double-pole main switch or isolator, and a bank of MCBs or RCBOs for lighting, sockets and dedicated circuits, with an RCD or RCBO protection strategy chosen for the installation.

24/7 Emergency Support

Electrical service you can count on

When single-phase meter board equipment fails, you need fast, reliable help from experienced engineers. We offer around-the-clock emergency support across Nairobi and East Africa — keeping your plant safe and powered, day or night. Whether it is an urgent breakdown or a scheduled repair, our team is ready to respond whenever you need us.

Cost and Estimates

What drives the cost

Direct 240 V metering

Sealed metering compartment and tails arranged for a direct single-phase KPLC connection.

Main switch and RCD strategy

Double-pole isolation with RCD or per-circuit RCBO protection selected for the final circuits.

Labelled final ways

Lighting, sockets and dedicated circuits on clearly labelled outgoing MCBs.

Compact enclosures

Surface or flush metal or moulded enclosures selected for the mounting position and environment.

Engineering Calculator

Instant Technical Sizing

Enter parameters for real-time IEC/KPLC-standard sizing. Results update dynamically.

Results

Design Current

Recommended Breaker

Recommended Type

Copper Cable Size

* For reference only. NPE engineering verifies configurations prior to build.

Frequently asked questions

How many ways do I need?
Allow a way per final circuit plus spare. A small dwelling is typically 6–12 ways; we size from your circuit schedule.
RCD or RCBO?
Per-circuit RCBOs avoid nuisance tripping across the whole board and are preferred for mixed loads; a split-load RCD arrangement is a lower-cost alternative.
Surface or flush mount?
Both are available; flush gives a tidier finish in finished rooms, surface is faster to install in plant and back-of-house areas.
Can you pre-wire it?
Yes, boards are built, wired and tested in the workshop and delivered ready to terminate.

When in doubt, put safety first

If you are ever unsure or feel unsafe, do not take chances — call a licensed engineer. Safety always comes first. Contact us for verification, specification and installation support.

+254 0737-944-014

Speak to our experts

Power your next
Business Ambition

Contact Us