The math we use, made available to you.
Professional estimation tools for electrical contractors and designers. Calculate critical specifications for low-voltage installations. Formulas align with IEC/BS 7671.
Preliminary Use Only
Calculators provide estimates under standard conditions. Verify specifications against current IEC/BS 7671 regulations with an NPE design engineer.
Cable Sizing
IEC 60364 Copper ConductorDetermine minimum conductor size based on continuous currents, phase connections, installation methods, and thermal grouping factors.
Adjusted current
—
Min Conductor
—
Breaker size
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
kVA ↔ Amps
Bidirectional ConverterConvert electrical load values between kVA and Line Amps across single phase, split phase, or polyphase industrial supplies.
Equivalent Amps
—
Active Power
—
Reactive Load
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Capacitor Bank Sizing
Power Factor CorrectionCalculate the required reactive power (kVAR) steps to stabilize system phase lag, raise power factor, and eliminate reactive load penalties.
Required kVAR
—
Standard Bank
—
Target Current
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Motor Starting Current
Inrush EstimatorEstimate full-load current (FLC) and transient peak starting current based on motor starter type (DOL, Star-Delta, Soft-Starter).
Full-Load (FLC)
—
Starting Current
—
Rec. protection
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Standby Generator Sizing
Connected Load & Motor StartingSize diesel standby power generators correctly, integrating connected load diversity profiles and motor startup power surges.
Required Load
—
Standard generator
—
Amps capacity
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Voltage Drop
Single/Three PhaseVerify that operational voltage drop along feeder cables does not exceed the standard 4% IEC regulatory boundary.
Voltage Drop
—
Percentage Drop
—
IEC Status
—⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Short-Circuit Current
Prospective FaultEstimate prospective short circuit current (Isc) downstream of your utility transformer to verify switchgear breaking capacity requirements.
Transformer FLC
—
Fault Current
—
Breaking Capacity
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Earthing Conductor
IEC 60364 SizingSize minimum protective grounding conductor cross-sections to safely handle fault energy dissipation without thermal damage.
Min Ground CSA
—
Standard CSA
—
Terminations
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Busbar Sizing
Cross-Section EstimatorObtain standard copper or aluminium flat rectangular busbar layout recommendations based on nominal switchboard current capacity.
Required Area
—
Suggested Bar
—
Standoff Span
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Lighting Lumen Method
Fixture Count EstimatorEstimate total luminaire fixture count required to achieve targeted lighting lux parameters across indoor working spaces.
Fixtures Required
—
Total Load
—
Load Current
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
UPS Battery Sizing
Backup AutonomyDetermine target lead-acid or lithium battery battery bank AH rating and DC circuit breaker protection for standby UPS backup loads.
Required Capacity
—
Storage energy
—
DC Breaker Size
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
Solar PV Sizing
Off-Grid EstimatorSize off-grid solar panels array peak rating, storage battery capacity, and hybrid solar power inverter rating based on load consumption.
Array Sizing
—
Panels Required
—
Inverter rating
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —
MCB/MCCB/ACB Sizing
Circuit Breaker selectorCalculate design current and select appropriate nominal breaker rating, frame size (MCB, MCCB, ACB), and tripping curves.
Nominal rating
—
Breaker Frame
—
Tripping Curve
—
⚡ Ratings
- —
🛠️ Accessories
- —
🔍 Filters & Details
- —