Power-quality equipment selection
Separate displacement power factor, distortion and supply events before choosing correction equipment.

Decisions before procurement
| Decision | What to establish | Evidence to bring |
|---|---|---|
| Plain capacitor bank | Review harmonics and source interaction first. Size reactive power from operating measurements. | kW, power factor and duty profile |
| Detuned bank | A series reactor changes resonance and capacitor duty. Selection needs a network study and matched components. | Spectrum, source impedance and stage configuration |
| Active filtering | Assess currents, neutral duty and operating modes to be compensated. Define performance at the connection point. | Measured distortion and acceptance criteria |
Your project brief
- kW, kvar, power factor and spectra
- Source data and existing bank ratings
- Load states and symptoms
- Connection point and performance target
Confirm the actual supply and control voltage. Kenyan projects commonly specify 230/240 V single-phase or 400/415 V three-phase; the selected equipment must match the measured supply and manufacturer rating.
Engineering methods
Related guides
Choose a reference or send your BOQ
Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.
Technical references
These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.



