ENGINEERED IN NAIROBI. WORKING ACROSS EAST AFRICA.

Energy submetering

Create a metering hierarchy that explains where energy is used and who owns the data.

Prepare your enquiryRead the selection guide

Energy submetering — engineering concept

Decisions before procurement

Energy submetering — application checks
DecisionWhat to establishEvidence to bring
Metering boundarySeparate incoming supply, tenant feeders, common services and process loads. Match each location to the reporting question.Single-line diagram and feeder ownership
Measurement chainCheck direct versus CT connection, ratio, secondary current, accuracy and lead burden.Current range, aperture and meter input
Data and commissioningAgree protocol, reading intervals, retention and naming. Verify polarity, phase order and scaling against a known load.Network access and commissioning record

Your project brief

  • Feeder schedule and current range
  • Existing CT ratio, class and secondary rating
  • Process/tenant/shared-services reporting purpose
  • Protocol, data ownership and commissioning scope

Confirm the actual supply and control voltage. Kenyan projects commonly specify 230/240 V single-phase or 400/415 V three-phase; the selected equipment must match the measured supply and manufacturer rating.

Engineering methods

Related guides

Choose a reference or send your BOQ

Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.

Send a BOQ for quotationDiscuss the application

Technical references

These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.