Energy submetering
Create a metering hierarchy that explains where energy is used and who owns the data.

Decisions before procurement
| Decision | What to establish | Evidence to bring |
|---|---|---|
| Metering boundary | Separate incoming supply, tenant feeders, common services and process loads. Match each location to the reporting question. | Single-line diagram and feeder ownership |
| Measurement chain | Check direct versus CT connection, ratio, secondary current, accuracy and lead burden. | Current range, aperture and meter input |
| Data and commissioning | Agree protocol, reading intervals, retention and naming. Verify polarity, phase order and scaling against a known load. | Network access and commissioning record |
Your project brief
- Feeder schedule and current range
- Existing CT ratio, class and secondary rating
- Process/tenant/shared-services reporting purpose
- Protocol, data ownership and commissioning scope
Confirm the actual supply and control voltage. Kenyan projects commonly specify 230/240 V single-phase or 400/415 V three-phase; the selected equipment must match the measured supply and manufacturer rating.
Engineering methods
Related guides
Choose a reference or send your BOQ
Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.
Technical references
These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.




