A survey gives engineering and facilities teams the same evidence base before money is committed. We assess condition, spare capacity, power quality, earthing and segregation.
The output is written to be used: findings, risks, options and indicative scope that can go straight into a budget or a technical quotation.
What We Cover
Load profile logging and phase balance assessment
Harmonic distortion and power factor measurement
Earthing, bonding and segregation review
Physical condition, IP rating and spare-way assessment
What You Receive
Survey report with findings, risk ranking and photographs
Measured load and power quality data with interpretation
Option comparison with indicative scope for each route
Recommended next step and information still required
Information To Get Started
Reason for the survey — capacity, reliability, cost or compliance
Single line diagram and existing load schedule if available
Logging duration acceptable on site
Any known constraints such as space, ceiling height or access
New load or plant being added to an existing board
High reactive power charges or suspected harmonic problems
Replace assumptions with measurements from the operating site.
Information to send
Survey question and operating schedule
Bills, drawings and nuisance-trip history
Safe access and measurement points
Scope to agree
Measurement plan
Observations and limitations
Prioritised recommendations
What changes the selection?
Equipment duty, installation conditions, available fault current, control interfaces and expansion plans all affect the specification. Agree the required drawings, tests and handover records before placing an order.
Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.
Conceptual power factor controllers and thyristor modules scene; exact specifications vary.