
Conceptual switch disconnectors scene; exact specifications vary.
Switch disconnectors
Plan an appropriate isolation point for equipment and maintenance.
Confirm: AC or DC duty · pole arrangement · locking requirements.
Compare selection details ↗Rooftop solar, hybrid inverters and EV charging installed as one power strategy


Solar generation, battery hybrid inverters and EV charging all draw from or feed the same distribution board, so they are best planned together rather than bolted on one at a time.
We handle the electrical side end to end: AC combiner boards, export metering provision, surge protection, load management for chargers, and coordination with existing generator changeover.
Equipment duty, installation conditions, available fault current, control interfaces and expansion plans all affect the specification. Agree the required drawings, tests and handover records before placing an order.
Request a scope review ↗Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

Conceptual switch disconnectors scene; exact specifications vary.
Plan an appropriate isolation point for equipment and maintenance.
Confirm: AC or DC duty · pole arrangement · locking requirements.
Compare selection details ↗
Conceptual fuse holders and fuses scene; exact specifications vary.
Match the fuse system to the protected circuit and fault conditions.
Confirm: Fuse category · breaking capacity · replacement access.
Compare selection details ↗
Conceptual surge protection devices scene; exact specifications vary.
Coordinate surge protection with the earthing and supply arrangement.
Confirm: System voltage · SPD coordination · installation location.
Compare selection details ↗
Conceptual energy meters and power analyzers scene; exact specifications vary.
Measure demand and energy at useful points in the system.
Confirm: Measured circuits · accuracy needs · data integration.
Compare selection details ↗
Conceptual automatic transfer switch controllers scene; exact specifications vary.
Coordinate source monitoring and the transfer sequence.
Confirm: Source arrangement · interlocking · return-to-mains logic.
Compare selection details ↗Send the available BQ, load schedule, single-line diagram or site description and we will confirm the next step.
Images illustrate service and engineering contexts. View image credits.
Use the shop for identified components, or send a BOQ for review. Engineering service scope is agreed separately.
LOVATO manufacturer family images; exact configurations vary by model.
Send a BOQ or parts list