We design and assemble low voltage panels to order: main distribution boards, motor control centres, PCC feeders and control panels, built around your single line diagram rather than a standard enclosure.
Every assembly leaves the workshop with general arrangement drawings, device schedules and routine test records, so consultants can approve and electricians can terminate without guesswork.
What We Cover
Panel design from your SLD, load schedule and fault level
Busbar sizing, discrimination study and form of separation selection
Assembly, wiring, ferruling and routine testing in the workshop
Delivery with GA drawings, schedules and as-built documentation
What You Receive
Approved general arrangement and schematic drawing set
Factory test certificates and torque records
Device schedule with settings as delivered
Labelling, shrouding and termination-ready presentation
Information To Get Started
Single line diagram or connected load list
Fault level at the incoming supply
Form of separation, IP rating and cable entry preferences
Preferred OEM — ABB, Schneider Electric or CHINT
A consultant design needs a build quote
An existing board cannot be extended economically
Specify the panel around its loads, installation and operators.
Information to send
Feeder schedule and fault duty
Form of separation and environment
Cable entry, dimensions and approved drawings
Scope to agree
General arrangement
Component and wiring schedules
Agreed inspection and test records
What changes the selection?
Equipment duty, installation conditions, available fault current, control interfaces and expansion plans all affect the specification. Agree the required drawings, tests and handover records before placing an order.
Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.
Conceptual motor protection circuit breakers scene; exact specifications vary.