Automatic and manual transfer systems coordinated with your generator
A transfer system is only dependable if mains failure detection, generator start, stabilisation and load pickup are engineered as one sequence. We install and commission ATS and MTS panels that make the transition invisible to the building.
Where standby plant already exists but changeover is untested or manual-only, we review the sequence, upgrade the controls and prove the result under witnessed load transfer.
Send the available BQ, load schedule, single-line diagram or site description and we will confirm the next step.