A motor control centre groups motor feeders, starting equipment, protection and controls into an assembly. Specify it from the load schedule, starting duty, available fault current and operating requirements, then establish the applicable IEC 61439 design and routine verification evidence. Component brands alone do not establish the rating of the complete MCC.

Engineer author: awaiting NPE confirmation. Published: . Updated: .

How an MCC groups motor feeders

Swipe across the diagram, or focus it and use the arrow keys. The key points are written below.

An incoming supply feeds a common bus with three independently specified motor feeders, illustrated as DOL, soft starter and VFD branches.
Conceptual MCC topology. Three example feeder types are shown; protection, isolation and control circuits are not detailed. Original NPE explanatory diagram.
  • Build the feeder schedule from each motor and driven load.
  • Select the starting method before fixing the enclosure layout.
  • Coordinate protection and review the complete assembly.

Start with a feeder schedule

Give every driven machine a feeder identifier and record its shaft rating, nameplate current, supply, duty and operating sequence. Identify motors that start together and those that must restart after a supply interruption. Separate present equipment from future provision: spare physical space, spare busbar capacity and spare control inputs are different requirements.

Choose the starting method for each load before fixing the enclosure layout. Direct-on-line, star-delta, soft starters and variable-frequency drives impose different wiring, acceleration, protection and cooling requirements. A single motor rating is insufficient to establish whether a loaded machine can accelerate successfully. Record the load torque, inertia and allowable supply disturbance.

Define the assembly interfaces

Describe the incoming supply, earthing arrangement, prospective fault current and upstream protective device. The fault study and manufacturer coordination data determine suitable protective combinations. Matching two nominal ampere ratings is not a selectivity study; an upstream trip may interrupt many otherwise healthy motor feeders.

Agree local and remote control, permissives, trips, emergency-stop interfaces and communication signals. Distinguish an operational stop command from electrical isolation. A cause-and-effect schedule should state the response to lost control power, broken communications and power restoration, so that automatic restart is an intentional, reviewed function.

Make the installation maintainable

Enclosure dimensions must accommodate cable bending, termination tools, segregated control wiring and safe access. Internal separation, fixed or withdrawable units and cable entry arrangement should be stated independently. Identify which tasks require complete isolation and which circuits need an alternative supply during a planned shutdown.

Calculate enclosure heat from actual equipment losses and simultaneous operation. Record the ambient temperature, altitude, dust, moisture and ventilation conditions rather than assuming a universal installation environment. Cooling openings and filters also affect maintenance and enclosure protection, so heat removal cannot be considered separately from the location.

Request drawings, feeder schedules, terminal plans, protection information and the verification basis applicable to the offered configuration. Record any deviation from the specification before fabrication. Factory functional checks should follow the agreed control sequence, while site commissioning confirms field wiring, rotation, interlocks and the installation settings.

Motor Control Centres in Kenya — selection checks
Specification itemInformation to establish
Motor feedersNameplate data, duty and starting sequence
SupplyVoltage, earthing, source and prospective fault current
ControlPermissives, trips, restart and communications
AssemblySeparation, access, thermal conditions and verification evidence

Frequently asked questions

What is the difference between an MCC and a distribution switchboard?

A distribution switchboard divides an incoming supply into protected outgoing circuits. An MCC also provides the switching and control functions needed by motor-driven equipment. The two functions can exist within one assembly, but motor duty, starting performance, control interfaces and maintenance access still need explicit specifications for each feeder.

Can an MCC include both soft starters and VFDs?

Yes, an assembly can contain different starting and drive arrangements when its electrical and thermal design accommodates them. Establish the purpose of each feeder, equipment losses, control supply and cable interfaces. Check the selected manufacturer combinations and protection requirements rather than treating mixed technologies as interchangeable cubicle contents.

What should accompany an MCC enquiry?

Provide the single-line diagram, motor schedule, operating sequence and installation conditions. Include available fault-level information and identify any missing study data. State the required internal separation, cable access, spare provision and automation interfaces. This allows the proposed scope and assumptions to be reviewed without inventing ratings from incomplete drawings.

Plan the next step

Explore the relevant product range · Use the planning calculator · Contact NPE

Technical references