Development demand scenario

Explore a development load using explicit unit simultaneity, common services and future allowance.

Enable JavaScript for live calculations. Read the method and default example below.

Method and assumptions

  • Common services are added after unit simultaneity, without further diversity.
  • User-entered simultaneity is a scenario assumption, not a regulatory coefficient.

Before using the result

  • Verify phase balance, utility requirements, actual load schedules and protective-device design.

Worked example

Illustrative default inputs. Enter your project values above.

Number of units
20
Connected load per unit
5 kW
Unit simultaneity
60 %
Common services demand
15 kW
Future allowance
20 %
Power factor
0.9
Three-phase voltage
415 V

Default results

Present demand
75 kW
With future allowance
100 kVA
Balanced line current
139.12 A

Choose a reference or send your BOQ

Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.

Send a BOQ for quotationDiscuss the application

Technical references

These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.