ENGINEERED IN NAIROBI. WORKING ACROSS EAST AFRICA.

Three-phase voltage unbalance

Compare three simultaneous line-to-line RMS readings. This magnitude calculation does not determine relay settings or negative-sequence voltage.

Enable JavaScript for live calculations. Read the method and default example below.

Method and assumptions

  • Unbalance (%) = 100 × maximum absolute deviation from the average / average.
  • Use line-to-line readings taken under the same operating condition.

Before using the result

  • No pass/fail limit or trip delay is selected. Check equipment limits and investigate supply conditions with a qualified engineer.
  • This method uses voltage magnitudes only; it is not an IEC negative-sequence calculation.

Worked example

Illustrative default inputs. Enter your project values above.

L1–L2 voltage
415 V
L2–L3 voltage
410 V
L3–L1 voltage
420 V

Default results

Average line voltage
415 V
Maximum deviation
5 V
Voltage unbalance
1.2 %

Choose a reference or send your BOQ

Compare relevant product families, then confirm the exact rating, control supply and duty. Price and availability are confirmed with your enquiry.

Send a BOQ for quotationDiscuss the application

Technical references

These references support planning. The exact model documentation and a project-specific engineering review govern the final specification.