# Relays, monitoring & protection

> Identify the protection function and control circuit before choosing a relay. Convert CT currents and assemble the information needed for a coordination review.

Canonical: https://nairobipower.co.ke/solutions/relays/
Last updated: 2026-11-10

Identify the protection function and control circuit before choosing a relay. Convert CT currents and assemble the information needed for a coordination review.

## Start with your operating requirements.

Identify the event that must be detected and what the circuit should do when it occurs. Separate monitoring, control logic and protective functions.

[Request an application review ↗](https://nairobipower.co.ke/contact/?product=Relays%2C%20monitoring%20%26%20protection)

## Explore the equipment options.

Use these families to frame the system, then confirm the exact model and compatibility with an engineer.

[### Electronic Protection Relays

Explore family ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[### Panel Instruments & Metering

Explore family ↗](https://nairobipower.co.ke/products/panel-instruments/)[### PLC, SCADA & BMS Automation Panels

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

### Technical details and selection tools

[Browse shop products](https://shop.nairobipower.co.ke/products)[Explore equipment ↓](https://nairobipower.co.ke/solutions/relays/#equipment-options)[Open sizing tools ↓](https://nairobipower.co.ke/solutions/relays/#hub-tools)

## Plan the next decision.

01 / Understand the duty

### Start with the operating picture.

Identify the event that must be detected and what the circuit should do when it occurs. Separate monitoring, control logic and protective functions.

02 / Check the interfaces

### Gather the evidence.

Record control voltage, sensor or CT details, contact duties and the device being operated. Existing settings and nuisance-trip records help frame the review.

03 / Agree the output

### Define the review you need.

Ask for documented setpoints, wiring interfaces and a functional test plan; protection settings require project-specific coordination.

## Work through a sizing scenario.

Choose a tool, replace the example inputs with site values, then save a scenario before changing your assumptions. Compare the results and include them in your project brief.

Enable JavaScript for interactive estimates or [ask our engineering team](https://nairobipower.co.ke/contact/).

## Start with the application.

### Control and interface

Confirm coil voltage, contact arrangement, switching category and load inrush.

### Monitoring

Define the voltage, phase, current or process condition and required response.

### Protection

Use a fault study and device curves to coordinate protection; do not guess pickup or time delay.

### Does the CT calculator provide relay settings?

No. It converts ideal primary and secondary current. It does not evaluate CT saturation, burden, class, pickup or time coordination. Never open-circuit an energised CT secondary.

[← Explore all application hubs](https://nairobipower.co.ke/solutions/)

## Specify the whole working system.

Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

### [Monitoring relays](https://nairobipower.co.ke/products/control-components/families/monitoring-relays/)

Identify phase, voltage or current conditions that need an alarm or trip.

Confirm: Monitored quantity · operating window · reset behaviour.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/monitoring-relays/)

### [Earth leakage relays](https://nairobipower.co.ke/products/control-components/families/earth-leakage/)

Review earth-leakage monitoring within a coordinated protection scheme.

Confirm: Sensor compatibility · trip arrangement · selectivity.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/earth-leakage/)

### [Time relays](https://nairobipower.co.ke/products/control-components/families/timers/)

Manage delays and sequencing in a defined control process.

Confirm: Timing function · control voltage · output duty.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/timers/)

### [General purpose relays](https://nairobipower.co.ke/products/control-components/families/interface-relays/)

Interface control signals with suitable output contacts.

Confirm: Coil voltage · contact rating · socket and suppression.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/interface-relays/)

### [Solid state relays](https://nairobipower.co.ke/products/control-components/families/solid-state-relays/)

Consider electronic switching for suitable repetitive loads.

Confirm: Load waveform · heat dissipation · leakage current.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/solid-state-relays/)

### [Current transformers](https://nairobipower.co.ke/products/control-components/families/current-transformers/)

Match sensing to the meter or protection application.

Confirm: Ratio and secondary · class and burden · conductor aperture.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/current-transformers/)

[Explore all 36 component families ↗](https://nairobipower.co.ke/products/control-components/)

### Continue into equipment & assemblies

[Electronic Protection Relays ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[Panel Instruments & Metering ↗](https://nairobipower.co.ke/products/panel-instruments/)[PLC, SCADA & BMS Automation Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### CT current conversion — worked example

Ideal secondary current = primary current × rated secondary / rated primary. This does not evaluate CT burden, accuracy or saturation.

### Example inputs

- CT rated primary: 400 A
- CT rated secondary: 5 A
- Primary current: 240 A

### Example result

- CT ratio: 80:1
- Ideal secondary current: 3 A
- Primary rating utilisation: 60 %

### Assumptions & limits

- Isecondary = Iprimary × rated secondary / rated primary.
- Ideal ratio only; no allowance for saturation, phase error, accuracy class or burden.
- Never open-circuit an energised CT secondary. Protection settings require a coordination study and approved testing.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [Schneider Electric: current transformer guidance](https://www.se.com/uk/en/faqs/FA212311/). This reference does not certify the website calculation or an NPE assembly.

### Short-circuit current — worked example

### Example inputs

- Transformer rating: 1000 kVA
- Impedance Z: 5 %
- Secondary voltage: 415 V — industrial
- Phase: 3Φ (three phase)
- Cable attenuation: 10 %

### Example result

- Transformer FLC: 1,391 A
- Prospective fault: 25 kA
- Breaking capacity: 36 kA

### Assumptions & limits

- Cable attenuation applied: 10 %
- Infinite upstream source assumed — utility contribution ignored
- Confirm the utility fault level with KPLC before finalising ratings
- Preliminary planning only. Final selection needs project-specific engineering verification.

### kVA ↔ amps — worked example

### Example inputs

- Value: 500
- Conversion: kVA → amps
- Phase: 3Φ (three phase)
- System voltage: 415 V — industrial
- Power factor: 0.8

### Example result

- Line current: 696 A
- Apparent power: 500 kVA
- Active power: 400 kW

### Assumptions & limits

- Phase system: 3Φ balanced at 415 V
- Multiplier used: √3 × V
- Assumes a balanced, linear load profile
- Preliminary planning only. Final selection needs project-specific engineering verification.

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### DC control power budget — worked example

### Example inputs

- DC output voltage: 24 V DC
- PLC and other continuous load: 25 W
- Simultaneously held DC coils: 6
- Holding power per DC coil: 3 W
- Simultaneous sensors: 10
- Power per sensor: 0.5 W
- Reserve allowance: 25 %

### Example result

- Connected continuous load: 48 W
- Budget with reserve: 60 W
- DC output current budget: 2.5 A

### Assumptions & limits

- Pload = PLC / other W + coil count × holding W + sensor count × sensor W.
- Pbudget = Pload × (1 + reserve / 100); Ibudget = Pbudget / DC voltage.
- Reserve is a planning assumption, not a manufacturer requirement.
- All listed loads must match the selected DC voltage. AC coil VA and DC coil watts are not interchangeable.
- Check coil pull-in peaks, simultaneous starting, temperature and altitude derating, overload behaviour and branch protection separately. This tool does not select a supply model.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [MEAN WELL — Power supply selection FAQ](https://www.meanwell.com/qa.aspx)

### Three-phase voltage unbalance — worked example

### Example inputs

- L1–L2 voltage: 415 V
- L2–L3 voltage: 410 V
- L3–L1 voltage: 420 V

### Example result

- Average line voltage: 415 V
- Maximum deviation: 5 V
- Voltage unbalance: 1.2 %

### Assumptions & limits

- Unbalance (%) = 100 × maximum absolute deviation from the average / average.
- Use line-to-line readings taken under the same operating condition.
- No pass/fail limit or trip delay is selected. Check equipment limits and investigate supply conditions with a qualified engineer.
- This method uses voltage magnitudes only; it is not an IEC negative-sequence calculation.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [US DOE — Energy Management for Motor-Driven Systems](https://www.energy.gov/sites/prod/files/2014/04/f15/NN0116.pdf)

## Bring these details.

- Relay model, function, supply and wiring diagram
- CT ratio, secondary rating, class and burden
- Protected equipment ratings and fault-level study
- Existing settings, trip circuit and test records

[Send your project brief ↗](https://nairobipower.co.ke/contact/?product=Relays%2C%20monitoring%20%26%20protection)

## Related equipment & services

[Electronic Protection Relays ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[Panel Instruments & Metering ↗](https://nairobipower.co.ke/products/panel-instruments/)[PLC, SCADA & BMS Automation Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

## Connect your application to the right components.

Explore these related component families, compare exact manufacturer references and build a quotation request.

[Open the E-Shop](https://shop.nairobipower.co.ke/products)

LOVATO manufacturer family images; exact configurations vary by model.

[Send a BOQ or parts list](https://shop.nairobipower.co.ke/bulk-order)

## Continue the specification

### Application and selection guides

- [Earthing and residual-current protection](https://nairobipower.co.ke/solutions/earthing-residual-current-protection/)

### Related engineering methods

- [TT electrode and RCD check](https://nairobipower.co.ke/tools/tt-rcd-check/)
- [MCB / MCCB / ACB sizing](https://nairobipower.co.ke/tools/breaker-sizing/)