# Real estate developers & building services

> Build a coordinated electrical brief from concept to handover. Explore demand scenarios for homes, common services and future capacity.

Canonical: https://nairobipower.co.ke/solutions/real-estate/
Last updated: 2026-11-10

Build a coordinated electrical brief from concept to handover. Explore demand scenarios for homes, common services and future capacity.

## Start with your operating requirements.

Build the brief around apartments or tenancies, shared services and future additions. List lifts, pumps, lighting, parking and any proposed EV charging.

[Request an application review ↗](https://nairobipower.co.ke/contact/?product=Real%20estate%20developers%20%26%20building%20services)

## Explore the equipment options.

Use these families to frame the system, then confirm the exact model and compatibility with an engineer.

[### Main & Sub-Distribution Boards

Explore family ↗](https://nairobipower.co.ke/products/lv-distribution-switchgear/main-distribution-boards/)[### Continuous Power & UPS Systems

Explore family ↗](https://nairobipower.co.ke/products/continuous-power/)

### Technical details and selection tools

[Browse shop products](https://shop.nairobipower.co.ke/products?category=Circuit+Protection)[Explore equipment ↓](https://nairobipower.co.ke/solutions/real-estate/#equipment-options)[Open sizing tools ↓](https://nairobipower.co.ke/solutions/real-estate/#hub-tools)

## Plan the next decision.

01 / Understand the duty

### Start with the operating picture.

Build the brief around apartments or tenancies, shared services and future additions. List lifts, pumps, lighting, parking and any proposed EV charging.

02 / Check the interfaces

### Gather the evidence.

Keep connected load, assumed diversity and available supply capacity separate. Confirm which common services need independent metering or backup.

03 / Agree the output

### Define the review you need.

Request an agreed load schedule and distribution concept, with space, access, metering and handover documentation included.

## Work through a sizing scenario.

Choose a tool, replace the example inputs with site values, then save a scenario before changing your assumptions. Compare the results and include them in your project brief.

Enable JavaScript for interactive estimates or [ask our engineering team](https://nairobipower.co.ke/contact/).

## Start with the application.

### Concept and feasibility

Record tenant loads, common services, backup priorities and phasing.

### Design coordination

Align risers, plant rooms, metering, earthing and space for safe maintenance.

### Handover and operation

Agree drawings, test records, equipment schedules and operator training in the project scope.

### Is the demand factor a code-approved value?

No. The calculator uses your explicit scenario assumption. A project engineer must establish permitted diversity and utility requirements for the actual development.

[← Explore all application hubs](https://nairobipower.co.ke/solutions/)

## Specify the whole working system.

Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

### [Energy meters and power analyzers](https://nairobipower.co.ke/products/control-components/families/energy-meters/)

Measure demand and energy at useful points in the system.

Confirm: Measured circuits · accuracy needs · data integration.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/energy-meters/)

### [Current transformers](https://nairobipower.co.ke/products/control-components/families/current-transformers/)

Match sensing to the meter or protection application.

Confirm: Ratio and secondary · class and burden · conductor aperture.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/current-transformers/)

### [Automatic transfer switch controllers](https://nairobipower.co.ke/products/control-components/families/transfer-controllers/)

Coordinate source monitoring and the transfer sequence.

Confirm: Source arrangement · interlocking · return-to-mains logic.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/transfer-controllers/)

### [Miniature and residual circuit breakers](https://nairobipower.co.ke/products/control-components/families/modular-breakers/)

Specify final-circuit protection around the connected loads.

Confirm: Circuit load · residual-current type · fault level.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/modular-breakers/)

### [Surge protection devices](https://nairobipower.co.ke/products/control-components/families/surge-protection/)

Coordinate surge protection with the earthing and supply arrangement.

Confirm: System voltage · SPD coordination · installation location.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/surge-protection/)

[Explore all 36 component families ↗](https://nairobipower.co.ke/products/control-components/)

### Continue into equipment & assemblies

[Main & Sub-Distribution Boards ↗](https://nairobipower.co.ke/products/lv-distribution-switchgear/main-distribution-boards/)[Continuous Power & UPS Systems ↗](https://nairobipower.co.ke/products/continuous-power/)

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Development demand scenario — worked example

Demand = units × kW per unit × simultaneity + common-services demand. Apply the entered reserve, then divide by power factor for kVA.

### Example inputs

- Number of units: 20
- Connected load per unit: 5 kW
- Unit simultaneity: 60 %
- Common services demand: 15 kW
- Future allowance: 20 %
- Power factor: 0.9
- Three-phase voltage: 415 V

### Example result

- Present demand: 75 kW
- With future allowance: 100 kVA
- Balanced line current: 139.12 A

### Assumptions & limits

- Common services are added after unit simultaneity, without further diversity.
- User-entered simultaneity is a scenario assumption, not a regulatory coefficient.
- Verify phase balance, utility requirements, actual load schedules and protective-device design.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [Schneider Electric: power loading of an installation](https://www.electrical-installation.org/enwiki/Power_loading_of_an_installation). This reference does not certify the website calculation or an NPE assembly.

### Standby generator sizing — worked example

### Example inputs

- Connected load: 250 kW
- Generator phase: 3Φ (three phase)
- Power factor: 0.8
- Diversity factor: 80 %
- Largest motor: 30 kW
- Altitude: 1700 m
- Ambient temperature: 30 °C

### Example result

- Required capacity: 313 kVA
- Standard set: 350 kVA
- Output current: 487 A

### Assumptions & limits

- Generator: 350 kVA prime/standby, 3Φ balanced at 415 V
- Design power factor: 0.8
- Step load acceptance should be confirmed against the alternator curve
- Nairobi sits near 1,700 m, so altitude derating is applied by default.
- Preliminary planning only. Final selection needs project-specific engineering verification.

### Solar PV sizing — worked example

### Example inputs

- Simultaneous peak AC load: 5 kW
- AC load power factor: 0.9
- Daily consumption: 12 kWh
- Peak sun hours: 5.5 h
- Panel wattage: 550 W
- Days of autonomy: 1
- Inverter: 1Φ (single phase)
- Storage chemistry: Lithium — 85 % usable

### Example result

- Array size: 2.8 kWp
- Panels required: 6
- Indicative inverter class: 8 kVA

### Assumptions & limits

- Hybrid inverter: 8 kVA, 1Φ single phase
- System losses assumed: 22 % (soiling, temperature, wiring)
- Peak sun hours: 5.5 h/day
- Inverter class considers entered simultaneous peak load and load power factor. Verify motor surge, overload duration, PV input limits and manufacturer ratings separately.
- Preliminary planning only. Final selection needs project-specific engineering verification.

### Lighting lumen method — worked example

### Example inputs

- Room length: 12 m
- Room width: 8 m
- Mounting height above work plane: 2.2 m
- Target illuminance: 500 lux — office / workshop
- Lumens per fixture: 4000
- Watts per fixture: 36 W
- Circuit: 1Φ (single phase)

### Example result

- Fixtures required: 27
- Connected load: 972 W
- Circuit current: 4.05 A

### Assumptions & limits

- Room index (K): 2.18
- Utilisation factor: 0.57 · maintenance factor: 0.8
- Glare: keep UGR below 19 for office and screen-based work
- Preliminary planning only. Final selection needs project-specific engineering verification.

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Managed EV charging capacity — worked example

### Example inputs

- Connected charge points: 8
- Maximum power per charge point: 7.4 kW
- Site active-power limit: 100 kW
- Other simultaneous site demand: 60 kW
- Configured EV power cap: 30 kW

### Example result

- Connected charging power: 59.2 kW
- Site headroom: 40 kW
- Managed EV allocation: 30 kW

### Assumptions & limits

- EV allocation = min(connected power, max(0, site limit − other demand), configured EV cap).
- All limits are active power in kW, not kVA. The equal-share illustration assumes every connected point requests power.
- This is a snapshot: building demand and vehicle acceptance change over time.
- Verify phase loading, minimum charging current, metering, controller communications and fail-safe behaviour. A low allocation may require queued or paused sessions; it does not guarantee every vehicle can charge.
- This does not size cables, protection, service capacity or certify charger compatibility.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [Schneider Electric — EV charging management systems](https://www.se.com/uk/en/product-subcategory/1840-ev-charging-management-systems/)

## Bring these details.

- Number and type of units with preliminary load schedules
- Lifts, pumps, ventilation, EV and common-area loads
- Utility connection and standby power requirements
- Construction phases, meter strategy and future expansion

[Send your project brief ↗](https://nairobipower.co.ke/contact/?product=Real%20estate%20developers%20%26%20building%20services)

## Related equipment & services

[Domestic & Residential ↗](https://nairobipower.co.ke/sectors/domestic-residential/)[Commercial & Retail Buildings ↗](https://nairobipower.co.ke/sectors/commercial-retail/)[Main & Sub-Distribution Boards ↗](https://nairobipower.co.ke/products/lv-distribution-switchgear/main-distribution-boards/)[Continuous Power & UPS Systems ↗](https://nairobipower.co.ke/products/continuous-power/)

## Connect your application to the right components.

Explore these related component families, compare exact manufacturer references and build a quotation request.

[Open the E-Shop](https://shop.nairobipower.co.ke/products?category=Circuit+Protection)

LOVATO manufacturer family images; exact configurations vary by model.

[Send a BOQ or parts list](https://shop.nairobipower.co.ke/bulk-order)

## Continue the specification

### Application and selection guides

- [Energy submetering](https://nairobipower.co.ke/solutions/energy-submetering/)
- [Hospitality and guest facilities](https://nairobipower.co.ke/sectors/hospitality/)

### Related engineering methods

- [Development demand scenario](https://nairobipower.co.ke/tools/development-demand/)
- [Lighting lumen method](https://nairobipower.co.ke/tools/lighting-lumen/)