> Prepare shutdowns and replacement decisions with a clear asset record. Compare motor energy costs and bring fault evidence to the maintenance conversation.

Canonical: https://nairobipower.co.ke/solutions/mro/
Last updated: 2026-11-10

Prepare shutdowns and replacement decisions with a clear asset record. Compare motor energy costs and bring fault evidence to the maintenance conversation.

## Start with your operating requirements.

Build an asset list and rank each item by operational consequence if it fails. Note symptoms, repeat faults and the maintenance window available.

[Request an application review ↗](https://nairobipower.co.ke/contact/?product=Maintenance%2C%20repair%20%26%20operations)

## Explore the equipment options.

Use these families to frame the system, then confirm the exact model and compatibility with an engineer.

[### Electronic Protection Relays

Explore family ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[### Industrial Electric Motors

Explore family ↗](https://nairobipower.co.ke/products/electric-motors/)[### External Maintenance Bypass Panels (MBP)

Explore family ↗](https://nairobipower.co.ke/products/continuous-power/maintenance-bypass-panels/)

### Technical details and selection tools

[Browse shop products](https://shop.nairobipower.co.ke/products)[Explore equipment ↓](https://nairobipower.co.ke/solutions/mro/#equipment-options)[Open sizing tools ↓](https://nairobipower.co.ke/solutions/mro/#hub-tools)

## Plan the next decision.

01 / Understand the duty

### Start with the operating picture.

Build an asset list and rank each item by operational consequence if it fails. Note symptoms, repeat faults and the maintenance window available.

02 / Check the interfaces

### Gather the evidence.

Capture nameplates, fault logs, inspection records and photographs before seeking a replacement. Confirm whether settings or wiring changed recently.

03 / Agree the output

### Define the review you need.

Agree shutdown boundaries, inspection scope, replacement acceptance checks and the records to update after the work.

## Work through a sizing scenario.

Choose a tool, replace the example inputs with site values, then save a scenario before changing your assumptions. Compare the results and include them in your project brief.

Enable JavaScript for interactive estimates or [ask our engineering team](https://nairobipower.co.ke/contact/).

## Start with the application.

### Condition review

Record symptoms, alarms, load conditions and inspection history before deciding what to replace.

### Planned shutdown

Define isolation boundaries, permits, spares, tests and the return-to-service sequence.

### Repair or replace

Compare condition, compatibility, downtime, energy use and supportability.

### Can equipment be serviced while energised?

Maintenance should be planned around approved isolation and a competent risk assessment. A website estimate never authorises live work.

[← Explore all application hubs](https://nairobipower.co.ke/solutions/)

## Specify the whole working system.

Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

### [Contactors](https://nairobipower.co.ke/products/control-components/families/contactors/)

Switch motors or other loads using the appropriate utilisation category.

Confirm: Load type and duty · coil supply · auxiliary contacts.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/contactors/)

### [Motor protection relays](https://nairobipower.co.ke/products/control-components/families/overload-relays/)

Monitor overload conditions within the motor protection scheme.

Confirm: Motor current · trip class · reset strategy.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/overload-relays/)

### [General purpose relays](https://nairobipower.co.ke/products/control-components/families/interface-relays/)

Interface control signals with suitable output contacts.

Confirm: Coil voltage · contact rating · socket and suppression.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/interface-relays/)

### [Switching power supplies](https://nairobipower.co.ke/products/control-components/families/control-supplies/)

Budget the control-system DC demand and start-up requirements.

Confirm: Output voltage · continuous current · inrush and derating.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/control-supplies/)

### [Automatic battery chargers](https://nairobipower.co.ke/products/control-components/families/battery-chargers/)

Maintain compatible starter or control batteries.

Confirm: Battery chemistry · DC voltage · charge characteristics.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/battery-chargers/)

[Explore all 36 component families ↗](https://nairobipower.co.ke/products/control-components/)

### Continue into equipment & assemblies

[Electronic Protection Relays ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[Industrial Electric Motors ↗](https://nairobipower.co.ke/products/electric-motors/)[External Maintenance Bypass Panels (MBP) ↗](https://nairobipower.co.ke/products/continuous-power/maintenance-bypass-panels/)

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Motor energy comparison — worked example

Annual kWh = rated shaft kW × load fraction × annual hours / efficiency fraction. Cost difference uses the entered energy tariff.

### Example inputs

- Rated shaft power: 30 kW
- Shaft load: 75 %
- Existing efficiency at duty: 88 %
- Replacement efficiency at duty: 93 %
- Annual running hours: 4000 h
- Energy tariff assumption: 25 KES/kWh
- Installed replacement cost: 150000 KES

### Example result

- Existing annual energy: 102,272.7 kWh
- Replacement annual energy: 96,774.2 kWh
- Annual cost difference: 137,463 KES

### Assumptions & limits

- Both motors deliver the same shaft duty. Use efficiency at this load, not an unrelated nameplate point.
- Tariff is your scenario input, not a published utility rate.
- Simple payback excludes finance, maintenance, downtime and tariff changes. Negative difference means higher operating cost.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [US Department of Energy: motor systems guide](https://www.energy.gov/sites/prod/files/2014/04/f15/amo_motors_guidebook_web.pdf). This reference does not certify the website calculation or an NPE assembly.

### CT current conversion — worked example

Ideal secondary current = primary current × rated secondary / rated primary. This does not evaluate CT burden, accuracy or saturation.

### Example inputs

- CT rated primary: 400 A
- CT rated secondary: 5 A
- Primary current: 240 A

### Example result

- CT ratio: 80:1
- Ideal secondary current: 3 A
- Primary rating utilisation: 60 %

### Assumptions & limits

- Isecondary = Iprimary × rated secondary / rated primary.
- Ideal ratio only; no allowance for saturation, phase error, accuracy class or burden.
- Never open-circuit an energised CT secondary. Protection settings require a coordination study and approved testing.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [Schneider Electric: current transformer guidance](https://www.se.com/uk/en/faqs/FA212311/). This reference does not certify the website calculation or an NPE assembly.

### kVA ↔ amps — worked example

### Example inputs

- Value: 500
- Conversion: kVA → amps
- Phase: 3Φ (three phase)
- System voltage: 415 V — industrial
- Power factor: 0.8

### Example result

- Line current: 696 A
- Apparent power: 500 kVA
- Active power: 400 kW

### Assumptions & limits

- Phase system: 3Φ balanced at 415 V
- Multiplier used: √3 × V
- Assumes a balanced, linear load profile
- Preliminary planning only. Final selection needs project-specific engineering verification.

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Three-phase voltage unbalance — worked example

### Example inputs

- L1–L2 voltage: 415 V
- L2–L3 voltage: 410 V
- L3–L1 voltage: 420 V

### Example result

- Average line voltage: 415 V
- Maximum deviation: 5 V
- Voltage unbalance: 1.2 %

### Assumptions & limits

- Unbalance (%) = 100 × maximum absolute deviation from the average / average.
- Use line-to-line readings taken under the same operating condition.
- No pass/fail limit or trip delay is selected. Check equipment limits and investigate supply conditions with a qualified engineer.
- This method uses voltage magnitudes only; it is not an IEC negative-sequence calculation.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [US DOE — Energy Management for Motor-Driven Systems](https://www.energy.gov/sites/prod/files/2014/04/f15/NN0116.pdf)

## Bring these details.

- Asset register, nameplates and single-line diagrams
- Fault history, alarms, measurements and photographs
- Shutdown window and operational constraints
- Required spares, test records and acceptance criteria

[Send your project brief ↗](https://nairobipower.co.ke/contact/?product=Maintenance%2C%20repair%20%26%20operations)

## Related equipment & services

[Maintenance ↗](https://nairobipower.co.ke/services/maintenance/)[Electronic Protection Relays ↗](https://nairobipower.co.ke/products/panel-instruments/protection-relays/)[Industrial Electric Motors ↗](https://nairobipower.co.ke/products/electric-motors/)[External Maintenance Bypass Panels (MBP) ↗](https://nairobipower.co.ke/products/continuous-power/maintenance-bypass-panels/)

## Connect your application to the right components.

Explore these related component families, compare exact manufacturer references and build a quotation request.

[Open the E-Shop](https://shop.nairobipower.co.ke/products)

LOVATO manufacturer family images; exact configurations vary by model.

[Send a BOQ or parts list](https://shop.nairobipower.co.ke/bulk-order)

## Continue the specification

### Application and selection guides

- [Motor starter selection guide](https://nairobipower.co.ke/products/motor-control-automation/starter-selection-guide/)

### Related engineering methods

- [Motor starting current](https://nairobipower.co.ke/tools/motor-starting/)
- [DC control power budget](https://nairobipower.co.ke/tools/control-power/)