# Motor controls & automation

> Compare starting methods around the machine, supply and operating sequence. Plan control, protection and commissioning together.

Canonical: https://nairobipower.co.ke/solutions/motor-controls/
Last updated: 2026-11-10

Compare starting methods around the machine, supply and operating sequence. Plan control, protection and commissioning together.

## Start with your operating requirements.

Describe what the machine does at start-up, during normal operation and when it stops. Include any interlocks and the process response to a power interruption.

[Request an application review ↗](https://nairobipower.co.ke/contact/?product=Motor%20controls%20%26%20automation)

## Explore the equipment options.

Use these families to frame the system, then confirm the exact model and compatibility with an engineer.

[### Motor Control & Automation

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/)[### DOL & Star-Delta Starter Panels

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/dol-star-delta-starters/)[### Variable Frequency Drive (VFD) Panels

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[### PLC, SCADA & BMS Automation Panels

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

### Technical details and selection tools

[Browse shop products](https://shop.nairobipower.co.ke/products?category=Industrial+Control)[Explore equipment ↓](https://nairobipower.co.ke/solutions/motor-controls/#equipment-options)[Open sizing tools ↓](https://nairobipower.co.ke/solutions/motor-controls/#hub-tools)

## Plan the next decision.

01 / Understand the duty

### Start with the operating picture.

Describe what the machine does at start-up, during normal operation and when it stops. Include any interlocks and the process response to a power interruption.

02 / Check the interfaces

### Gather the evidence.

Bring the motor nameplate, driven-load details and existing control drawings. Review starting method, overload protection and the required speed range as one system.

03 / Agree the output

### Define the review you need.

Agree the operating sequence, control interfaces, test procedure and operator handover before the panel is built.

## Work through a sizing scenario.

Choose a tool, replace the example inputs with site values, then save a scenario before changing your assumptions. Compare the results and include them in your project brief.

Enable JavaScript for interactive estimates or [ask our engineering team](https://nairobipower.co.ke/contact/).

## Start with the application.

### Fixed speed, simple sequence

Review DOL or star-delta starting against supply limits and machine acceleration.

### Controlled acceleration

A soft starter may suit a fixed-speed duty; starting torque and thermal limits still matter.

### Variable process demand

A VFD can control speed. Review motor compatibility, harmonics, cooling and cable length.

### Can any motor use star-delta starting?

No. It needs a suitable three-phase motor, accessible winding terminals and a voltage rating compatible with delta operation on the supply. Verify the nameplate and load torque.

[← Explore all application hubs](https://nairobipower.co.ke/solutions/)

## Specify the whole working system.

Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

### [Motor protection circuit breakers](https://nairobipower.co.ke/products/control-components/families/motor-breakers/)

Protect individual motor circuits as part of a coordinated starter.

Confirm: Motor full-load current · fault level · starter coordination.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/motor-breakers/)

### [Contactors](https://nairobipower.co.ke/products/control-components/families/contactors/)

Switch motors or other loads using the appropriate utilisation category.

Confirm: Load type and duty · coil supply · auxiliary contacts.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/contactors/)

### [Motor protection relays](https://nairobipower.co.ke/products/control-components/families/overload-relays/)

Monitor overload conditions within the motor protection scheme.

Confirm: Motor current · trip class · reset strategy.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/overload-relays/)

### [Soft starters](https://nairobipower.co.ke/products/control-components/families/soft-starters/)

Explore controlled starting for fixed-speed machinery.

Confirm: Starting torque · load inertia · bypass arrangement.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/soft-starters/)

### [Variable speed drives](https://nairobipower.co.ke/products/control-components/families/drives/)

Match motor speed to process demand where the application permits.

Confirm: Motor current · load torque · speed range and cooling.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/drives/)

### [Pushbuttons and selector switches](https://nairobipower.co.ke/products/control-components/families/pushbuttons/)

Define clear local commands and machine operating modes.

Confirm: Operator function · contact blocks · ingress protection.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/pushbuttons/)

### [Micro PLCs and HMI](https://nairobipower.co.ke/products/control-components/families/plc-hmi/)

Define the operating sequence, inputs and operator interface together.

Confirm: I/O schedule · communications · operator screens.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/plc-hmi/)

### [Switching power supplies](https://nairobipower.co.ke/products/control-components/families/control-supplies/)

Budget the control-system DC demand and start-up requirements.

Confirm: Output voltage · continuous current · inrush and derating.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/control-supplies/)

[Explore all 36 component families ↗](https://nairobipower.co.ke/products/control-components/)

### Continue into equipment & assemblies

[Motor Control & Automation ↗](https://nairobipower.co.ke/products/motor-control-automation/)[DOL & Star-Delta Starter Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/dol-star-delta-starters/)[Variable Frequency Drive (VFD) Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[PLC, SCADA & BMS Automation Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Motor starting current — worked example

### Example inputs

- Motor rating: 55 kW
- System voltage: 415 V — industrial
- Phase: 3Φ (three phase)
- Starting method: Direct on line (DOL)
- Efficiency: 92 %
- Power factor: 0.86

### Example result

- Full load current: 96.7 A
- Starting current: 580 A
- Starting multiplier assumption: 6 × FLC

### Assumptions & limits

- Starting multipliers are illustrative, not measured inrush or guaranteed torque.
- Verify motor nameplate, load acceleration, supply limits and starts per hour.
- Preliminary planning only. Final selection needs project-specific engineering verification.

### Motor energy comparison — worked example

Annual kWh = rated shaft kW × load fraction × annual hours / efficiency fraction. Cost difference uses the entered energy tariff.

### Example inputs

- Rated shaft power: 30 kW
- Shaft load: 75 %
- Existing efficiency at duty: 88 %
- Replacement efficiency at duty: 93 %
- Annual running hours: 4000 h
- Energy tariff assumption: 25 KES/kWh
- Installed replacement cost: 150000 KES

### Example result

- Existing annual energy: 102,272.7 kWh
- Replacement annual energy: 96,774.2 kWh
- Annual cost difference: 137,463 KES

### Assumptions & limits

- Both motors deliver the same shaft duty. Use efficiency at this load, not an unrelated nameplate point.
- Tariff is your scenario input, not a published utility rate.
- Simple payback excludes finance, maintenance, downtime and tariff changes. Negative difference means higher operating cost.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [US Department of Energy: motor systems guide](https://www.energy.gov/sites/prod/files/2014/04/f15/amo_motors_guidebook_web.pdf). This reference does not certify the website calculation or an NPE assembly.

### MCB / MCCB / ACB sizing — worked example

### Example inputs

- Load value: 160
- Unit: Amps
- System phase: 3Φ (three phase)
- System voltage: 415 V — industrial
- Load profile: General power
- Fault level: 25 kA
- Altitude: 1700 m
- Ambient temperature: 35 °C

### Example result

- Nominal rating (In): 200 A
- Device frame: MCCB (moulded case)
- Tripping curve: Curve C (5–10× In)

### Assumptions & limits

- Altitude derate: 0 % at 1700 m
- Temperature derate: 4 % at 35 °C
- Load profile factor applied: 1.1×
- Preliminary planning only. Final selection needs project-specific engineering verification.

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### DC control power budget — worked example

### Example inputs

- DC output voltage: 24 V DC
- PLC and other continuous load: 25 W
- Simultaneously held DC coils: 6
- Holding power per DC coil: 3 W
- Simultaneous sensors: 10
- Power per sensor: 0.5 W
- Reserve allowance: 25 %

### Example result

- Connected continuous load: 48 W
- Budget with reserve: 60 W
- DC output current budget: 2.5 A

### Assumptions & limits

- Pload = PLC / other W + coil count × holding W + sensor count × sensor W.
- Pbudget = Pload × (1 + reserve / 100); Ibudget = Pbudget / DC voltage.
- Reserve is a planning assumption, not a manufacturer requirement.
- All listed loads must match the selected DC voltage. AC coil VA and DC coil watts are not interchangeable.
- Check coil pull-in peaks, simultaneous starting, temperature and altitude derating, overload behaviour and branch protection separately. This tool does not select a supply model.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [MEAN WELL — Power supply selection FAQ](https://www.meanwell.com/qa.aspx)

### Three-phase voltage unbalance — worked example

### Example inputs

- L1–L2 voltage: 415 V
- L2–L3 voltage: 410 V
- L3–L1 voltage: 420 V

### Example result

- Average line voltage: 415 V
- Maximum deviation: 5 V
- Voltage unbalance: 1.2 %

### Assumptions & limits

- Unbalance (%) = 100 × maximum absolute deviation from the average / average.
- Use line-to-line readings taken under the same operating condition.
- No pass/fail limit or trip delay is selected. Check equipment limits and investigate supply conditions with a qualified engineer.
- This method uses voltage magnitudes only; it is not an IEC negative-sequence calculation.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Method reference: [US DOE — Energy Management for Motor-Driven Systems](https://www.energy.gov/sites/prod/files/2014/04/f15/NN0116.pdf)

## Bring these details.

- Motor nameplate, voltage and full-load current
- Driven machine, torque profile and starts per hour
- Control voltage, interlocks and emergency-stop requirements
- Cable length, environment and supply capacity

[Send your project brief ↗](https://nairobipower.co.ke/contact/?product=Motor%20controls%20%26%20automation)

## Related equipment & services

[Motor Control & Automation ↗](https://nairobipower.co.ke/products/motor-control-automation/)[DOL & Star-Delta Starter Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/dol-star-delta-starters/)[Variable Frequency Drive (VFD) Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[PLC, SCADA & BMS Automation Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/plc-scada-automation/)

## Connect your application to the right components.

Explore these related component families, compare exact manufacturer references and build a quotation request.

[Open the E-Shop](https://shop.nairobipower.co.ke/products?category=Industrial+Control)

LOVATO manufacturer family images; exact configurations vary by model.

[Send a BOQ or parts list](https://shop.nairobipower.co.ke/bulk-order)

## Continue the specification

### Application and selection guides

- [Motor starter selection guide](https://nairobipower.co.ke/products/motor-control-automation/starter-selection-guide/)

### Related engineering methods

- [Motor starting current](https://nairobipower.co.ke/tools/motor-starting/)
- [DC control power budget](https://nairobipower.co.ke/tools/control-power/)