# Agribusiness & water systems

> Plan power for irrigation, processing, ventilation and cold storage around the seasonal duty. Start with flow, head, operating hours and critical loads.

Canonical: https://nairobipower.co.ke/solutions/agribusiness/
Last updated: 2026-11-10

Plan power for irrigation, processing, ventilation and cold storage around the seasonal duty. Start with flow, head, operating hours and critical loads.

## Start with your operating requirements.

Map the process from intake to pumping, processing and storage. Identify seasonal operating hours and loads that cannot tolerate interruption.

[Request an application review ↗](https://nairobipower.co.ke/contact/?product=Agribusiness%20%26%20water%20systems)

## Explore the equipment options.

Use these families to frame the system, then confirm the exact model and compatibility with an engineer.

[### Variable Frequency Drive (VFD) Panels

Explore family ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[### Industrial Electric Motors

Explore family ↗](https://nairobipower.co.ke/products/electric-motors/)

### Technical details and selection tools

[Browse shop products](https://shop.nairobipower.co.ke/products?category=Industrial+Control)[Explore equipment ↓](https://nairobipower.co.ke/solutions/agribusiness/#equipment-options)[Open sizing tools ↓](https://nairobipower.co.ke/solutions/agribusiness/#hub-tools)

## Plan the next decision.

01 / Understand the duty

### Start with the operating picture.

Map the process from intake to pumping, processing and storage. Identify seasonal operating hours and loads that cannot tolerate interruption.

02 / Check the interfaces

### Gather the evidence.

Bring pump flow and head requirements, motor nameplates and the expected sequence of operation. Include water availability and environmental exposure.

03 / Agree the output

### Define the review you need.

Agree responsibilities for electrical supply, pump selection, process controls and commissioning so the interfaces are clear.

## Work through a sizing scenario.

Choose a tool, replace the example inputs with site values, then save a scenario before changing your assumptions. Compare the results and include them in your project brief.

Enable JavaScript for interactive estimates or [ask our engineering team](https://nairobipower.co.ke/contact/).

## Start with the application.

### Irrigation and transfer

Establish total dynamic head, flow and water conditions before selecting a pump and motor.

### Processing and handling

Review conveyors, mixers and mills for starting load, dust and cleaning conditions.

### Cold-chain continuity

Separate critical refrigeration loads and verify backup starting capacity and run time.

### Can solar sizing alone determine an irrigation system?

No. Water demand, storage, pump curves, daily irradiance and available pumping hours must be considered together.

[← Explore all application hubs](https://nairobipower.co.ke/solutions/)

## Specify the whole working system.

Start with the equipment duty. Add the control, protection and measurement functions that your project needs; these are options to review, not a pre-approved assembly.

### [Level controls and float switches](https://nairobipower.co.ke/products/control-components/families/level-controls/)

Control filling or pumping from reliable level signals.

Confirm: Fluid properties · probe or float · dry-run strategy.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/level-controls/)

### [Variable speed drives](https://nairobipower.co.ke/products/control-components/families/drives/)

Match motor speed to process demand where the application permits.

Confirm: Motor current · load torque · speed range and cooling.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/drives/)

### [Motor protection circuit breakers](https://nairobipower.co.ke/products/control-components/families/motor-breakers/)

Protect individual motor circuits as part of a coordinated starter.

Confirm: Motor full-load current · fault level · starter coordination.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/motor-breakers/)

### [Monitoring relays](https://nairobipower.co.ke/products/control-components/families/monitoring-relays/)

Identify phase, voltage or current conditions that need an alarm or trip.

Confirm: Monitored quantity · operating window · reset behaviour.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/monitoring-relays/)

### [Micro PLCs and HMI](https://nairobipower.co.ke/products/control-components/families/plc-hmi/)

Define the operating sequence, inputs and operator interface together.

Confirm: I/O schedule · communications · operator screens.

[Compare selection details ↗](https://nairobipower.co.ke/products/control-components/families/plc-hmi/)

[Explore all 36 component families ↗](https://nairobipower.co.ke/products/control-components/)

### Continue into equipment & assemblies

[Variable Frequency Drive (VFD) Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[Industrial Electric Motors ↗](https://nairobipower.co.ke/products/electric-motors/)

## Understand the estimate.

These examples use the default inputs. Change the live controls above for your own scenario; the reference examples below remain fixed.

### Water pumping duty — worked example

Hydraulic power (kW) = 9.81 × flow (m³/h) × total head (m) / 3600. Divide by pump and motor efficiency fractions for electrical input.

### Example inputs

- Water flow: 36 m³/h
- Total dynamic head: 50 m
- Pump efficiency: 70 %
- Motor efficiency: 90 %
- Daily operation: 8 h

### Example result

- Hydraulic power: 4.905 kW
- Electrical input: 7.786 kW
- Daily energy: 62.29 kWh

### Assumptions & limits

- Clean water density assumed 1000 kg/m³; gravity 9.81 m/s².
- Head must include static lift and pipe / fitting losses.
- Match pump curves and check NPSH, water quality and starting demand. No pump or motor size is selected.
- Preliminary planning only. Final selection needs project-specific engineering verification.

Technical reference: [KSB: pump power input](https://www.ksb.com/en-global/centrifugal-pump-lexicon/article/power-input-1117260). This reference does not certify the website calculation or an NPE assembly.

### Motor starting current — worked example

### Example inputs

- Motor rating: 55 kW
- System voltage: 415 V — industrial
- Phase: 3Φ (three phase)
- Starting method: Direct on line (DOL)
- Efficiency: 92 %
- Power factor: 0.86

### Example result

- Full load current: 96.7 A
- Starting current: 580 A
- Starting multiplier assumption: 6 × FLC

### Assumptions & limits

- Starting multipliers are illustrative, not measured inrush or guaranteed torque.
- Verify motor nameplate, load acceleration, supply limits and starts per hour.
- Preliminary planning only. Final selection needs project-specific engineering verification.

### Solar PV sizing — worked example

### Example inputs

- Simultaneous peak AC load: 5 kW
- AC load power factor: 0.9
- Daily consumption: 12 kWh
- Peak sun hours: 5.5 h
- Panel wattage: 550 W
- Days of autonomy: 1
- Inverter: 1Φ (single phase)
- Storage chemistry: Lithium — 85 % usable

### Example result

- Array size: 2.8 kWp
- Panels required: 6
- Indicative inverter class: 8 kVA

### Assumptions & limits

- Hybrid inverter: 8 kVA, 1Φ single phase
- System losses assumed: 22 % (soiling, temperature, wiring)
- Peak sun hours: 5.5 h/day
- Inverter class considers entered simultaneous peak load and load power factor. Verify motor surge, overload duration, PV input limits and manufacturer ratings separately.
- Preliminary planning only. Final selection needs project-specific engineering verification.

## Bring these details.

- Required flow, total dynamic head and water quality
- Seasonal operating hours and available power
- List of process motors and cold-room loads
- Site conditions, cable distances and expansion plans

[Send your project brief ↗](https://nairobipower.co.ke/contact/?product=Agribusiness%20%26%20water%20systems)

## Related equipment & services

[Agro-Processing & FMCG ↗](https://nairobipower.co.ke/sectors/agro-processing/)[Variable Frequency Drive (VFD) Panels ↗](https://nairobipower.co.ke/products/motor-control-automation/vfd-panels/)[Industrial Electric Motors ↗](https://nairobipower.co.ke/products/electric-motors/)[Solar & EV Charging Infrastructure ↗](https://nairobipower.co.ke/services/solar-ev-charging/)

## Connect your application to the right components.

Explore these related component families, compare exact manufacturer references and build a quotation request.

[Open the E-Shop](https://shop.nairobipower.co.ke/products?category=Industrial+Control)

LOVATO manufacturer family images; exact configurations vary by model.

[Send a BOQ or parts list](https://shop.nairobipower.co.ke/bulk-order)

## Continue the specification

### Application and selection guides

- [Pump and level control](https://nairobipower.co.ke/solutions/pump-level-control/)

### Related engineering methods

- [Water pumping duty](https://nairobipower.co.ke/tools/pump-duty/)
- [DC control power budget](https://nairobipower.co.ke/tools/control-power/)