# Meter Boards in Kenya: Direct and CT Metering

> A meter board accommodates metering equipment and the associated connection, isolation and protection arrangements.

Canonical: https://nairobipower.co.ke/knowledge/meter-boards-kenya/
Last updated: 2026-11-10

A meter board accommodates metering equipment and the associated connection, isolation and protection arrangements. Specify the number of supplies, direct or CT measurement, meter interfaces and the utility or project requirements before fixing its layout. A tenant count alone cannot determine cable space, CT characteristics or acceptance of the completed arrangement.

Engineer author: awaiting NPE confirmation. Published: 9 November 2026. Updated: 9 November 2026.

## CT secondary burden is a complete loop

Swipe across the diagram, or focus it and use the arrow keys. The key points are written below.

Concept only, not a wiring diagram. Test facilities, shorting arrangements, polarity and earthing are omitted and require the approved installation design. Original NPE explanatory diagram.

- Match CT ratio, meter input and specified accuracy requirements.
- Include the meter and both lead directions in the burden assessment.
- Use qualified personnel and an approved safe testing procedure; never open an energised CT secondary.

## Define what is being measured

Start by distinguishing utility revenue metering from private submetering. Identify the circuit boundaries and the party that owns, operates and reads each meter. Confirm whether the supplies are single-phase or three-phase and whether a combined metering and distribution assembly is intended. These decisions affect the compartment layout and the access responsibilities.

Direct-connected metering carries the measured circuit through the meter’s designated terminals. CT metering uses instrument transformers and a compatible meter input. The decision follows the actual meter limits and the utility or project specification; there is no universal threshold to infer merely from the description of a building.

## Specify CTs as a measurement system

Confirm the required primary-to-secondary ratio against the expected load range, the meter input and the specified accuracy requirements. Assess low-load performance as well as maximum current. A larger ratio is not automatically a more accurate choice, and a ratio selected from the incoming breaker alone does not describe the complete metering duty.

Include the connected meter and the outgoing and return lead path when assessing external burden. For a resistive lead loop, its burden at rated secondary current is current squared multiplied by loop resistance. The CT’s declared accuracy is associated with defined operating conditions; a burden budget alone does not establish overall measurement accuracy.

Agree polarity, phase identification, test facilities and the approved shorting arrangement. An energised CT secondary must not be left open-circuit. Installation and testing require an appropriate safe procedure and qualified personnel, rather than informal disconnection of a meter while its primary circuit remains energised.

## Resolve layout before fabrication

Obtain the required meter dimensions, terminal orientation and sealing requirements. Show the separation of metering areas, accessible isolation and outgoing connections on the arrangement drawing. Provide cable bending and termination space for the actual conductors. Label every metered circuit consistently with the load or tenant schedule.

Check the earthing and neutral arrangement against the installation’s system and the applicable supply requirements. Clarify access to protective devices and the division between sealed and serviceable areas. Where approval is required, identify who submits the drawings and what evidence establishes acceptance; do not treat a generic board description as approval of a particular installation.

Meter Boards in Kenya: Direct and CT Metering — selection checks
| --- |
| Decision | Information needed |
| Metering purpose | Utility revenue or private submetering and circuit boundaries |
| Measurement arrangement | Direct input limits or compatible CT and meter inputs |
| CT characteristics | Ratio, burden, accuracy conditions and polarity |
| Physical layout | Meter dimensions, sealing, isolation, cable access and labels |

## Frequently asked questions

### How do I choose a CT ratio for a meter board?

Use the expected operating-current range together with the meter’s input and the specified accuracy conditions. Check performance at low load and confirm the required maximum-current capability. Ratio is only one part of the selection: burden, polarity, dimensions and the approved metering arrangement must also be resolved for the actual installation.

### What is included in CT secondary burden?

External burden includes the connected instruments and their complete lead circuit. The resistance of both outgoing and return conductors matters. At rated secondary current, resistive lead burden is I²R in VA. Confirm instrument data and the CT’s stated burden and accuracy conditions; this calculation does not verify saturation or an installation’s complete metering accuracy.

### Does a meter board have automatic utility approval?

No. Acceptance depends on the applicable requirements and the specific arrangement submitted for the installation. Establish the metering purpose, meter and CT requirements, sealing provisions and approval responsibilities before fabrication. Obtain the relevant acceptance evidence rather than assuming that a particular enclosure, component brand or tenant count guarantees approval.

## Plan the next step

[Explore the relevant product range](https://nairobipower.co.ke/products/meter-boards/) · [Use the planning calculator](https://nairobipower.co.ke/tools/ct-burden/) · [Contact NPE](https://nairobipower.co.ke/contact/)

## Technical references

- [Talema — Introduction to current transformers](https://talema.com/introduction-current-transformers/)
- [Schneider Electric — Distribution switchboards](https://www.electrical-installation.org/enwiki/Distribution_switchboards)
- [Schneider Electric — CT component selection guide](https://ckm-content.se.com/ckmContent/sfc/servlet.shepherd/document/download/0691H00000FJskOQAT)